Construction Defects, Delay and Payment Disputes

How deficiency, delay and non-payment disputes on a building project are usually framed, what records decide them, and the deadlines that come first.

3 min read · Updated August 1, 2026 · Concaso Editorial

General guidance

This guide currently contains general legal information. Jurisdiction-specific guidance for your location is coming soon. The Concaso assessment will still tailor its questions and analysis based on your jurisdiction.

Tailored versions available: Ontario, British Columbia, England & Wales.

Plaintiff Centre

If you are bringing this claim

The focus is scope, approvals and what was actually delivered against what was agreed.

  • Write down what happened in order, with dates, before memory fades.
  • Collect the documents listed below — they usually matter more than the argument.
  • Check the limitation period for where you are; it is the one thing that cannot be fixed later.
  • Work out whether the other side can actually pay or comply before spending money.
  • Keep chasing in writing, so there is a record of what was asked and when.

Reading this from the other side? Switch to the Defendant Centre view.

Working out what kind of dispute this is

Most construction disputes fall into a small number of patterns, and the pattern usually determines the route, the evidence and the deadlines. It is common for one project to raise several at once.

PatternUsual questionWhere it is usually resolved
Deficient workDoes the work meet the contract and the applicable standard?Court, arbitration, or a warranty programme
DelayWho caused the extension of time, and what did it cost?Contract mechanism first, then court or arbitration
Non-paymentIs the amount certified, due and unpaid?Statutory payment process, lien, or court
Scope and change ordersWas the extra work authorised?Contract mechanism, then court

Proving a deficiency

A deficiency claim generally compares the work as built against what the contract, drawings, specifications and applicable building standards required. Disagreement is usually about the standard, not about the facts.

  • Identify each deficiency separately, with a location and a date observed
  • Photograph it in place, with something for scale, before any remedial work
  • Keep the contract documents, drawings and specifications that describe the requirement
  • Record whether the contractor was given a chance to return and fix it
  • Get a repair estimate from an independent trade

Holdback and withholding as an owner

As an owner, the usual questions are whether the holdback was maintained correctly, whether amounts were withheld for reasons the contract allows, and whether notice of the deficiency was given in the manner the contract requires.

Deadlines and lien rightsGeneral guidance

Construction has some of the shortest deadlines in civil disputes. Lien and statutory payment timelines are often measured in weeks from last supply, substantial completion or the date of a payment notice, and they run independently of any ordinary limitation period. Confirm the applicable dates early rather than after negotiations stall.

Documents to gather

  • The contract, including general conditions, drawings and specifications
  • All change orders, site instructions and requests for information
  • Progress draws, certificates for payment and invoices
  • Site logs, daily reports and schedule updates
  • Deficiency lists and inspection or engineering reports
  • Correspondence about the disputed work

Evidence that carries weight

  • Dated photographs of each deficiency before remedial work
  • An independent estimate or report on the cost to correct
  • A written record of the instruction for any extra work
  • Proof of last date of supply to the project
  • Records showing what was applied for versus what was certified

Want both lists in one printable page?

Common mistakes

  • Missing a lien or prompt-payment deadline while negotiating
  • Repairing or removing defective work before documenting it
  • Relying on verbal change instructions with no written confirmation
  • Withholding payment without giving the reason the contract requires
  • Treating a snag list as a full deficiency record

Frequently asked

The contractor says they will come back and fix it. Should I let them?

Many contracts require that the contractor be given an opportunity to correct their own work, and refusing can affect what you recover later. Document the offer, the scope and the dates either way.

Can I withhold payment because of deficiencies?

Contracts and payment legislation usually set out when and how amounts can be withheld, and often require a written notice with reasons within a short window. Withholding outside that framework creates its own exposure.

Does a lien mean I get paid?

A lien is generally a security step that preserves a position against the property; it is not itself payment or a decision that the money is owed. It usually has to be followed by further steps within a fixed period.

How much detail do I need on a delay claim?

Delay claims are normally evidenced day by day: the planned schedule, the events that intervened, who was responsible, and the cost consequence. Summaries prepared long afterwards carry much less weight than contemporaneous records.

Is a home warranty programme an alternative?

For new residential work, some jurisdictions have warranty or protection programmes with their own claim windows and processes. They can run alongside a contract dispute but usually have separate, earlier deadlines.

Assess my situation

Concaso turns what you already know into a structured, confidential report — strengths, weaknesses, missing evidence, and the deadlines that matter. We will start you in the right place based on this guide, as a owner.